![]() A stormwater tracking permit (based on development fee guide and calculator) will also be issued and an as-built impervious survey is required prior to final inspection. There is a cost and review associated with this study. More specifically, the study indicates that there will be no more than a 0.04 foot (ft.) rise in flood levels for the 2, 10, 25, 50, and 100-year storm events. Stormwater Analysis: Applicants provide a stormwater analysis showing that there will not be an adverse impact on downstream properties. There are two options that may be used by a property owner wishing to exceed the maximum impervious limitations of a lot: What if I want to exceed my maximum impervious limitations? ![]()